You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Batu Kali Segmen Inlet Setu Babakan Sudah 80 Persen
.
photo Mustaqim Amna - Beritajakarta.id

Inlet Setu Babakan Sheet Pile Repair Has Touched 80 Percent

The Inlet Setu Babakan sheet pile repair in Srengseng Sawah, Jagakarsa TPU area carried out by the South Jakarta Water Resources Sub-agency keeps being accelerated.

We have sent eight personnel to repair the sheet pile that has 40 meters length with 2.7 meters height

The repair itself has been started since early March and is targeted to be complete by the end of this month and now has reached 80 percent.

"We have sent eight personnel to repair the sheet pile that has 40 meters length with 2.7 meters height," expressed South Jakarta Water Resources Sub-agency's Maintenance Division Head, Junjung, Sunday (5/17).

Setu Babakan PBB Made as Leading Tourist Destination

He explained, after it is done, the sheet pile would again function as a link to the flow of water from Depok to Setu Babakan.

"Our problem is only about the sufficient flow of water," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing